• Blogs

    blog-header

Bathroom Makeover: Client anticipates selling home within 3 to 5 years

Master Bathroom Makover

When a client calls us for a home renovation project, we always look at the project, discuss the client’s objectives and provide them with a few suggestions including which path we believe is the best choice considering the client’s scope, time and budget constraints.

Scope of Work:

One of our Fairfield County, CT clients was interest in a master bathroom remodel as well as a laundry room update. They are planning on selling their home within 3 to 5 years and wanted to increase the value of their home by making it more marketable, but at the same time have as high a rate of return on their investment as possible.

Bathroom before Makeover

 Bathroom before Makeover

Solution:

Through our consultation process, we helped our client decide to do a bathroom makeover. We would not call this project a bathroom remodel because we did not demolish the entire bathroom. The existing cabinets were removed and refurbished and a new corner cabinet was fabricated and finished with open shelves and two new doors. Hardware was updated.

Bathroom after Makeover

Bathroom after Makeover

Client’s mirrors were cut to size and installed in custom made frames. Countertops were fabricated and installed in dark Emperador honed marble.

Bathroom tub before makeover

Bathroom Tub before Makeover

Bathroom tub after makeover

Bathroom Tub after Makeover

The shower, tub surround and bathroom floor was demolished and replaced with Durango honed filled beveled Mexican Travertine. Plumbing was brought up to current code requirements.
shower before makeover

Bathroom Shower before Makeover

shower after makeover

Bathroom Shower after Makeover

Shower curb, shampoo niche shelf and seat was fabricated, furnished and installed in 2 cm Durango honed travertine. Shower was enclosed with full height frameless shower door and panel.

Shower Border after Bathroom Makeover

Shower Border & Shampoo Niche Shelf after Bathroom Makeover

Shower border and inside shampoo niche shelf was created by installing 2” x 2” Durango mosaic beveled limestone tiles and 4” x 12” Mandalay mosaic strips.

laundry room before makeover

Laundry Room before Millwork

laundry room shelves after makeover

Laundry Room after open shelf laundry cabinet was installed

We believe our Fairfield, County, CT clients made the right decisions. Jeff and our clients were extremely pleased with their choices. The master bathroom received an “extreme makeover” without exceeding the clients’ budget and they are able to enjoy their “new” bathroom until time of sale.

Whether you are looking for a bathroom remodel, kitchen remodel or home renovation, Titus Built is here for you. Our extensive field experience and first-hand practical knowledge, coupled with the architectural design expertise of our award-winning team, bring proven professionalism to every aspect of your remodeling project, from initial concepts to final construction.

To preview some of our projects, please visit our Bathroom Remodeling Portfoliohttp://bit.ly/jLvnZS.

AD&B Master Bathroom Renovation(1)

 

If you’re in the Atlanta, GA area, send a “shout out” to our friends Dale & Guy atAtlanta Design & Build in Marietta, Georgia. They’ve completed some fantastic bathroom renovations as well. http://atlantadesignbuild.com/gallery